Tag Archive for: harbor-bridge
![](https://www.nitrocrete.com/wp-content/uploads/2022/11/bg-harbor-1.jpg)
Six-Figure Savings by Eliminating Concrete Cooling Tubes on Harbor Bridge
Corpus Christi's iconic Harbor Bridge required mass concrete for 500-foot tall towers. High humidity and ambient temperature required extreme temperature control to avoid complications with the concrete in the forms. NITROcrete™ enabled the project to meet temperature specifications without concrete cooling tubes, saving time and expense.